Carriage 19 now very nearly finished |
The frame of the new carriage 100 |
121 being stripped of side pannels |
Cricc in Undercoat |
I was given the task of removing the last two pannels - 1 left |
121 - visable for the last time. |
Repainted 26 |
Inside 105 progress has been made |
Inside 105 showing the new loo |
121 again, after it had met the grinder! |
The tamper bogies |
Linda's boiler has now been painted |
Earl's bogies have been stripped for overhaul |
Earl, in the process of being converted to coal |
The chassis for the new 100 |
2 weeks later and the chassis is in the carriage shop |
19 is very close now |
Tamper bogie being positioned |
Earl's new fireholes ready for the new doors. |
Taliesin being steamed up on the 28th |
|
Tal ready to depart, Diller driving |
The view from milepost 5 |
| |